Sailet blog
Software, automation and managing IT. Practical guides, project experience and business decisions.
All topics92
How to automate accounting operations while retaining control of the data
Automation≈2 min readChoose a recurring operation for automation: entry, validation, reconciliation and transfer to accounting. Define the accounting and technical teams’ roles.
Automating a logistics company: from request to confirmed completion
Automation≈2 min readHow to connect requests, operator assignments, statuses and documents in logistics. What to check with incomplete data, route changes and loss of connectivity.
Project management methods: Scrumban, PRINCE2, Six Sigma and the critical path
Project delivery≈3 min readHow to choose an approach to work flow, project stages, quality and scheduling. Part two of the project management overview, with practical limits.
Methods for an IT project: choose the right tool for each question
Project delivery≈3 min readHow to choose a method for clarifying the problem, testing a solution and organising delivery. Practical outputs instead of a compulsory list of methodologies.
How to assess an automation project: requirements, budget and ROI
Project delivery≈3 min readMethods and tools for evaluating a project: workflows, cost ranges, risks, ROI and acceptance. Separate an assumption-based estimate from a promise of success.
Preparing for automation: 7 steps for business owners
Automation≈3 min readHow to choose a process, establish a baseline, compare solutions and prepare the first delivery stage. Seven steps from a business problem to a measurable result.
The full cost of an IT product: what to budget beyond development
Project delivery≈3 min readBuilding a total cost of ownership: launch, operation, changes and transition. A calculation structure for comparing an existing service with a custom system.
Deciding whether automation is needed and assessing its value
Automation≈2 min readChoosing a process and building the case for automation: volume, manual work, errors, alternatives and full cost. Avoiding double-counting the effect.
What does your business need to achieve?
We’ll discuss what to build or change first, which systems need to connect, and what to clarify before estimating scope and cost.